Mount Fuji, Yoshida Trail: map, stages, weather and gear
The exact gear list for this trek, built on the real weather along the route: the night at the highest sleeping point, the heat at the low point, rain and snow month by month, then each stage and where to sleep there.
- Distance
- 9 mi
- Duration
- 2 stages from Official Mount Fuji website, Yoshida Trail huts
- Elevation gain
- ≈ 2,461 ft per day
- High point
- 12,388 ft Kengamine, summit of Mount Fuji
- Nights
- In huts highest: Fujisan Hotel (8th Station), 11,155 ft
- Season
- Jul → Sep
- Field data
- 12 hikers including 11 with no commercial link
Mount Fuji in July: what to pack?
11 required items and 8 advised for a July departure, the first month of the season. Every threshold comes from the route’s weather and from what 12 hikers really had in their packs.
- RequiredRain jacket 20,000 mmRain on 63% of days, 0.28 in on wet days: waterproof rating of 20,000 mm or more
- RequiredRain pantsRain on 63% of days
- RequiredFleece or insulated jacketEvenings and nights down to 34°F
- RequiredSunscreen SPF 50UV 16, elevation 12,388 ft: SPF 50
- RequiredSunglasses cat. 4Elevation 12,388 ft and snow possible: category 4
- RequiredWater 2 L4 h without a water source at 68°F: carry 2 L
- RequiredWaterproof shoesSnow possible: waterproof membrane; high or low cut, whichever suits your foot
- RequiredFirst-aid kitFirst-aid kit in the essential equipment of the official site, which may check your bag at the entrance; at minimum adhesive bandages, a roll bandage and medical tape (France’s Ministry of Sports), plus your own medications
- RequiredPaper mapMap in the essential equipment of the official site; paper, covering the whole route, at 1:100,000 or finer; an app complements it but doesn’t replace it
- RequiredHeadlamp 200 lmStarts before dawn
- RequiredPack 25–40 L2 days with nights in huts: 25 to 40 L, rated to carry 17.6 lb
- AdvisedPack coverKeeps your pack dry (not needed if the pack has a built-in cover)
- AdvisedBeanieNights at 34°F
- AdvisedGlovesMornings at 34°F
- AdvisedHat UPF 40UV 16: neck and face covered
- AdvisedPower bankThe official site recommends one, and the prefecture warns that phones drain faster up there; 10,000 mAh or more; on a plane, 100 Wh at most, in the cabin and never in checked baggage, 2 at most per person, and don’t recharge it on board
- AdvisedTrekking poles2,461 ft of climbing per day, with a loaded pack: easier on your knees downhill
- AdvisedGaitersSnow possible
- AdvisedBase layerIn the pack of 9 of 12 hikers (8 of 11 with no commercial link)
Mount Fuji: your pack, for your dates.
Change the month, the length or the type of night: we recalculate the weather and build the gear list, product by product, with the price and the weight.
Mount Fuji: the weather month by month
10-year normals (2015-2024), brought to the route’s elevation. Nights are the coldest expected at Fujisan Hotel (8th Station) (11,155 ft), days the hottest at Fuji Subaru Line 5th Station (7,562 ft). For a departure within 9 days, the tool above uses MET Norway forecasts instead of normals.
| Month | Nights | Days | Rainy days | Snow |
|---|---|---|---|---|
| January | down to −9°F | up to 32°F | 22% | possible |
| February | down to −8°F | up to 34°F | 36% | possible |
| March | down to −2°F | up to 45°F | 42% | possible |
| April | down to 5°F | up to 52°F | 50% | possible |
| May | down to 14°F | up to 59°F | 46% | possible |
| June | down to 23°F | up to 61°F | 61% | possible |
| July | down to 34°F | up to 68°F | 63% | possible |
| August | down to 37°F | up to 70°F | 75% | — |
| September | down to 28°F | up to 64°F | 63% | possible |
| October | down to 14°F | up to 57°F | 46% | possible |
| November | down to 3°F | up to 48°F | 40% | possible |
| December | down to −4°F | up to 37°F | 20% | possible |
Sources: Copernicus ERA5-Land and ERA5, WorldClim 2.1 for rain. A rainy day counts from 0.06 in. Details are on the Transparency page.
Mount Fuji: map, stages and where to sleep
The trail’s route and its stage points, then each stage with the lodgings from the official list, their price when published and the booking link.
- Start and finish · 5th Station (Fuji Subaru Line)
- Fujisan Hotel (8th Station)
No split published: climb to a hut at the 8th Station on day 1, summit and descent on day 2.
Stage 1 · 5th Station (Fuji Subaru Line) → 8th Station
Tomoe-kan (Original 8th Station) (hut) · open « The climbing period in 2026 is scheduled to begin from July 1st to September 10th. »
⚠ online reservations only, in English: “Reservations can only be made online, and are scheduled to start May 11th.”; “We do not accept reservations from tours or travel agencies.”; payment: “Payment can only be made in advance by credit card.”; “If you pay by credit card at least 10 days in advance, you will receive a 1,000 yen discount per person.”; single rooms, “All plans include two meals.”; phone: “please call +81-90-4366-5922” if the confirmation email doesn’t arrive; 5th Station gate (notice of April 17, 2026): “The gate will be closed from 2 PM to 3 AM the following day.*Entry to the mountain is not permitted during gate closure hours, but you can descend at any time.”; “If you have a reservation for accommodation at a mountain hut, you will be able to pass through the gate even if restrictions are put in place. Making a reservation is optional.”; rule shared by the huts: “The mountain huts on Mt. Fuji operate on a book-in-advance system.”
13 500 ¥ (night with 2 meals, Monday to Thursday, 2026 rate)
14 500 ¥ (night with 2 meals, Friday, Sunday and holidays, 2026 rate) · 15 500 ¥ (night with 2 meals, Saturday and the day before a holiday, 2026 rate)
Fujisan Hotel (8th Station, 11,155 ft) (hut) · open “宿泊施設(7月1日から9月上旬)” (translation: lodging from July 1 to early September); trail season 2026: “It is scheduled to run from July 1st to September 10th, 2026.”
⚠ Bardy’s reference night; 2026 rates read on the hotel’s rates page (address not kept); “※ 完全予約制です。ご予約なしの宿泊は、できません。” (translation: reservation required, no night without a booking); individual online booking only, reserved for residents of Japan: “旅行業者様及び、宿泊施設の方からの代理予約、海外にお住いの方の予約は、承れません。” (translation: no booking through an agency or from abroad); “We wouldn't accept individual reservation by phone.”; 5th Station gate (notice of April 17, 2026): “The gate will be closed from 2 PM to 3 AM the following day.*Entry to the mountain is not permitted during gate closure hours, but you can descend at any time.”; “If you have a reservation for accommodation at a mountain hut, you will be able to pass through the gate even if restrictions are put in place. Making a reservation is optional.”; rule shared by the huts: “The mountain huts on Mt. Fuji operate on a book-in-advance system.”
9 300 ¥ (night without meals, Monday to Thursday, 2026 rate; other days: ¥10,300 to ¥11,800)
12 000 ¥ (night with 2 meals, Monday to Thursday, 2026 rate) · 13 500 ¥ (night with 2 meals, Friday, 2026 rate) · 14 500 ¥ (night with 2 meals, Saturday, 2026 rate) · 13 000 ¥ (night with 2 meals, Sunday, 2026 rate)
Reservation required · Call 0555-24-6512
Horaikan (8th Station, 10,335 ft) (hut) · open “They are only open during the trail opening season.” (official site); trail season 2026: “It is scheduled to run from July 1st to September 10th, 2026.”; the hut doesn’t publish its own dates
⚠ hut at 10,335 ft (3,150 m), lower than Bardy’s reference night (11,155 ft, 3,400 m); online booking, card payment in advance (“宿泊料金は、クレジットカード事前決済となります。”, translation: the price is paid in advance by card); dormitory: “ドミトリーの場合、一度に予約できる人数は、4名様までになっております。” (translation: 4 people at most per dormitory booking); the hut’s phone (calls from 9 am to 8 pm); 5th Station gate (notice of April 17, 2026): “The gate will be closed from 2 PM to 3 AM the following day.*Entry to the mountain is not permitted during gate closure hours, but you can descend at any time.”; “If you have a reservation for accommodation at a mountain hut, you will be able to pass through the gate even if restrictions are put in place. Making a reservation is optional.”; rule shared by the huts: “The mountain huts on Mt. Fuji operate on a book-in-advance system.”
15 000 ¥ (dormitory, night with 2 meals, Sunday to Thursday, 2026 rate)
16 000 ¥ (dormitory, night with 2 meals, Friday and August 9, 2026 rate) · 17 000 ¥ (dormitory, night with 2 meals, Saturday, July 19 and August 10, 2026 rate)
Stage 2 · 8th Station → Summit, then 5th Station
Prices and opening dates read on November 2, 2026; Bardy can’t see availability: book through the official link. Stages from Official Mount Fuji website, Yoshida Trail huts.
Before you go
The rules written in the trek’s official texts, with their source.
¥4,000 fee on the Yoshida Trail
From July to September
To pass the 5th Station gate, you pay ¥4,000 per person, even if you sleep in a hut. Pay online up to the same day (reservation optional, with a share held for the same day) or on site. There is no ATM at the 5th Station
Sources: Mt. Fuji official site, Yamanashi Prefecture; Yamanashi Prefecture, 2025 review; Mt. Fuji official site, FAQ
Equipment required at the gate
From July to September
By paying, you commit to having warm clothing, a separate rain jacket and rain pants, and mountain shoes. If the rangers judge that you are not keeping these commitments, they can refuse you the trail
Gate closed from 2 p.m. to 3 a.m. without a hut night
From July to September
Without a hut night booked, you can’t climb between 2 p.m. and 3 a.m. The gate also closes when 4,000 people have passed in a day, except for those who reserved their passage. Going down is possible at any hour
Sources: Mt. Fuji official site, Yamanashi Prefecture; Mt. Fuji official site, FAQ
Huts by reservation
From July to September, for nights in huts
Mt. Fuji huts take reservations only and open only during the season. The highest ones fill up first: book early
Sources: Mt. Fuji official site, Yoshida Trail huts; Ministry of the Environment, 2026
Tents prohibited
For nights in a tent
Pitching a tent on Mt. Fuji is prohibited by law, as is making a fire
Sources: Mt. Fuji official site, FAQ
Via the Shizuoka trails
From July to September
If you climb via Fujinomiya, Subashiri or Gotemba, you need an online course validated by a test, ¥4,000 and, to climb between 2 p.m. and 3 a.m., a hut night booked. No daily cap on that side
Trails closed off season
From September to June
In 2026, the season runs from July 1 to September 10 on the Yoshida Trail, with an opening sometimes delayed by snow. Outside it, the trails from the 5th Station to the summit are closed: the Road Act (Article 46) prohibits passage there, on pain of 6 months in prison or a ¥300,000 fine. Huts, toilets and first-aid stations are closed
Sources: Mt. Fuji official site, off season
Frequently asked questions
Mount Fuji: how many days does it take?
Bardy’s version has 2 stages, from Official Mount Fuji website, Yoshida Trail huts, with about 2,461 ft of elevation gain per day. No split published: climb to a hut at the 8th Station on day 1, summit and descent on day 2.
Mount Fuji: how hard is it, and how much climbing?
Bardy gives no difficulty rating: no single grading covers every trek. The figures that make it up: 9 mi in 2 days, about 2,461 ft of elevation gain per day; high point: Kengamine, summit of Mount Fuji, 12,388 ft; highest night: Fujisan Hotel (8th Station), 11,155 ft.
Mount Fuji: when is the best time to go?
Bardy uses the season from July to September. Over those months, based on 10 years of weather normals, the coldest night drops to 28°F at 11,155 ft (September), and snow stays possible in July and September.
Mount Fuji: what is the weather month by month?
Based on 10 years of normals (2015-2024) brought to the route’s elevation, nights at the highest sleeping point (Fujisan Hotel (8th Station), 11,155 ft) drop to −9°F in January, the coldest month, and days at the low point (Fuji Subaru Line 5th Station, 7,562 ft) climb to 70°F in August. During the season, the share of rainy days ranges from 63% in July to 75% in August. For a departure within 9 days, the tool uses MET Norway forecasts instead of normals.
Mount Fuji: what gear should you bring in July?
In July, Bardy counts 11 required items, including rain jacket 20,000 mm, rain pants, fleece or insulated jacket and sunscreen SPF 50, and 8 advised. Every threshold comes from the route’s weather and from the packs of 12 hikers who filmed it.
Mount Fuji: how should you dress in July?
In July, nights drop to 34°F at 11,155 ft and days climb to 68°F at the low point (7,562 ft), based on 10 years of normals. Bardy’s gear list includes: rain jacket 20,000 mm, rain pants, fleece or insulated jacket, waterproof shoes, beanie (advised), gloves (advised), hat UPF 40 (advised), gaiters (advised) and base layer (advised).
Mount Fuji: what budget should you plan?
Bardy does not price the whole trip: not the transport, not the food, not the total for the nights. What it calculates: the July gear list, all bought new, the cheapest item line by line at the prices Bardy tracks, comes to $1,799 for a man and $1,770 for a woman (one line is left without a product and is not counted). What you already own comes off the list in the tool. The 2026 prices of the nights, when the lodging publishes them, are in “Where to sleep”.
Mount Fuji: where to sleep?
Bardy lists 3 lodgings across the 2 stages, with their published price and the official booking link. Some of them require a reservation.
Mount Fuji: do you need a permit or a reservation?
Before you go: ¥4,000 fee on the Yoshida Trail, huts by reservation and via the Shizuoka trails. Details and official texts are in the “Before you go” section.